Save the last old-growth wetlands in Sarasota Bay! Ask the Army Corps of Engineers to deny Permit No. SAJ-2015-01503.
The developers behind Longbar Pointe’s “Sea Spray" are seeking approval from the United States Army Corps of Engineers to construct an 8- to 10-foot-high gabion wall (a wall made of large rocks inside wire cages) along the edge of old-growth wetlands.
The permit application tells one story, claiming that the wall would reduce the need for extensive fill slopes and avoid impacts to nearby mangrove wetlands. However, the reality on the ground is very different, threatening some of the last high-quality, old-growth wetlands in Sarasota Bay.
Save the last old-growth wetlands in Sarasota Bay! Ask the Army Corps of Engineers to deny Permit No. SAJ-2015-01503.
The developers behind Longbar Pointe’s “Sea Spray" are seeking approval from the United States Army Corps of Engineers to construct an 8- to 10-foot-high gabion wall (a wall made of large rocks inside wire cages) along the edge of old-growth wetlands.
The permit application tells one story, claiming that the wall would reduce the need for extensive fill slopes and avoid impacts to nearby mangrove wetlands. However, the reality on the ground is very different, threatening some of the last high-quality, old-growth wetlands in Sarasota Bay.